| 
        
            | Please use this identifier to cite or link to this item: http://hdl.handle.net/10174/27481 |  
 
| Title: | Dual-resource Constrained Scheduling for Quality Control Laboratories |  | Authors: | Cunha, M. Viegas, J.
 Martins, M.
 Coito, T.
 Figueiredo, Joao
 Sousa, J.
 Vieira, S.
 |  | Editors: | ELSEVIER |  | Keywords: | Scheduling dual-resource constraint
 quality control
 flexible job shop
 mixed integer linear programming
 |  | Issue Date: | 2019 |  | Publisher: | 9th IFAC Conf. on Manufacturing Modelling, Management and Control |  | Citation: | M. Cunha, J. Viegas, M. Martins, T. Coito, J. Figueiredo, J. Sousa, S. Vieira, [2019] “Dual-resource Constrained Scheduling for Quality Control Laboratories”, Intl. IFAC/IEEE/IFIP/IFORS Conf. on Manufacturing Modelling, Management and Control - 9th MIM 2019, Berlin, Germany |  | Abstract: | This work presents a novel formulation for quality control laboratory scheduling
considering both equipment and analysts as constraints. The problem is modelled as a dualresource
constrained 
exible job shop problem. The formulation considers analyst's tasks in
multiple time points during the processing of samples. The mathematical model is implemented
as a mixed integer linear programming model (MILP) aiming to minimize makespan. Two sets
of instances for the scheduling problem are developed and solved. The  rst instance consists on a
small example that illustrates the proposed formulation and is solved to optimality. The second
instance mimics the real industrial problem and shows the challenges resulting from growing
complexity. |  | URI: | https://www.sciencedirect.com/journal/ifac-papersonline/vol/52/issue/13 http://hdl.handle.net/10174/27481
 |  | Type: | article |  | Appears in Collections: | CEM - Artigos em Livros de Actas/Proceedings 
 |  
 
    
     
    
 Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.   |