Please use this identifier to cite or link to this item:
http://hdl.handle.net/10174/27481
|
Title: | Dual-resource Constrained Scheduling for Quality Control Laboratories |
Authors: | Cunha, M. Viegas, J. Martins, M. Coito, T. Figueiredo, Joao Sousa, J. Vieira, S. |
Editors: | ELSEVIER |
Keywords: | Scheduling dual-resource constraint quality control flexible job shop mixed integer linear programming |
Issue Date: | 2019 |
Publisher: | 9th IFAC Conf. on Manufacturing Modelling, Management and Control |
Citation: | M. Cunha, J. Viegas, M. Martins, T. Coito, J. Figueiredo, J. Sousa, S. Vieira, [2019] “Dual-resource Constrained Scheduling for Quality Control Laboratories”, Intl. IFAC/IEEE/IFIP/IFORS Conf. on Manufacturing Modelling, Management and Control - 9th MIM 2019, Berlin, Germany |
Abstract: | This work presents a novel formulation for quality control laboratory scheduling
considering both equipment and analysts as constraints. The problem is modelled as a dualresource
constrained
exible job shop problem. The formulation considers analyst's tasks in
multiple time points during the processing of samples. The mathematical model is implemented
as a mixed integer linear programming model (MILP) aiming to minimize makespan. Two sets
of instances for the scheduling problem are developed and solved. The rst instance consists on a
small example that illustrates the proposed formulation and is solved to optimality. The second
instance mimics the real industrial problem and shows the challenges resulting from growing
complexity. |
URI: | https://www.sciencedirect.com/journal/ifac-papersonline/vol/52/issue/13 http://hdl.handle.net/10174/27481 |
Type: | article |
Appears in Collections: | CEM - Artigos em Livros de Actas/Proceedings
|
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.
|