Please use this identifier to cite or link to this item: http://hdl.handle.net/10174/12892

Title: Optimal operation planning of wind-hydro power systems using a MILP approach
Authors: Melício, Rui
Cruz, Paulo
Pousinho, Hugo
Mendes, Victor
Collares-Pereira, Manuel
Editors: Camarinha-Matos, L.M.
Mendonça, R.
Barrento, N.S.
Keywords: Collective awareness
day-ahead market
Issue Date: Apr-2014
Publisher: SPRINGER
Abstract: This paper addresses an approach for a day-ahead operation of a wind-hydro power system in an electricity market. A wind-hydro system is able to mitigate the intermittence and the variations on wind power, mitigating the economic penalty due to unbalance in the satisfaction of the compromises. The approach consists in a model given by a mixed-integer linear programming. This model maximizes the profit in the day-ahead market, taking into consideration the operating constraints of both the wind the farm and the pumping-hydro system. Finally, numerical case studies illustrate the interest and effectiveness of the proposed approach.
URI: http://hdl.handle.net/10174/12892
Type: article
Appears in Collections:FIS - Publicações - Artigos em Revistas Internacionais Com Arbitragem Científica

Files in This Item:

File Description SizeFormat
Doceis_14_Paulo.pdf248.56 kBAdobe PDFView/OpenRestrict Access. You can Request a copy!
FacebookTwitterDeliciousLinkedInDiggGoogle BookmarksMySpaceOrkut
Formato BibTex mendeley Endnote Logotipo do DeGóis 

Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.

 

Dspace Dspace
DSpace Software, version 1.6.2 Copyright © 2002-2008 MIT and Hewlett-Packard - Feedback
UEvora B-On Curriculum DeGois